GETTING STARTED · ATLAS
Give every change
evidence you can trust.
Turn business expectations into repeatable tests. Explore test data, answer quality, coverage, and the evidence behind a release decision.
Chapter 1
Start with the promise to the user
ATLAS stands for Agentic Testing and Lifecycle Automation Suite. It helps builders create and maintain repeatable tests for AI Agent Studio workflows and agentic applications, through the AI Studio skill and CLI.
The business expert defines what good behavior means. The builder turns that expectation into inputs, checks, and data. Together they review what failed and whether the evidence supports a release.
ATLAS supports regression testing around changes. METRO provides evaluation, tracing, and production observability inside Studio. Findings from a live agent can become new regression scenarios; the two tools complement one another.
Explore the parts
Scenario
A scenario describes an input and the business behavior expected under those conditions.
Alex asks for equipment while the inventory lookup returns no records.
Oracle references: ATLAS overview · ATLAS prerequisites

Chapter 2
Turn a promise into a test
For Alex’s empty-inventory request, the expected behavior is simple: take the no-results route, explain that availability could not be confirmed, and suggest the agreed next step. Do not invent a reservation.
A fixture supplies the recorded or intentionally generated data for that scenario. Path assertions check the route. Exact assertions check fixed outputs or fields. A semantic rubric checks qualities such as grounding and usefulness when wording can vary.
A good rubric describes something you can observe. “Mentions that no inventory record was returned” is clearer than “sounds helpful.” Review the actual answer alongside any judge score.
Explore the parts
Equipment found
Use a known record. Check the lookup route, required output fields, and grounding in that returned record.
Expected: describe the returned availability accurately; do not claim a reservation was made.
Oracle references: Prepare ATLAS tests · Assertions and semantic judging
Chapter 3
Cover the meaningful alternatives
A sync plan identifies missing tests, tests affected by changes, and coverage needing review. Showing that plan is an inspection step; completing it can create tests, prepare data, execute workflows, and judge results.
Begin with success, empty data, missing input, an error, and an unsupported request. Then add important branch outcomes, write paths, and business exceptions. Preserve deliberate custom tests when generated coverage changes.
Some interactions need a conversation test. Supported root CHAT workflows can pause for a HUMAN response or resume a WAIT timeout. HUMAN email and approval processes are not covered; nested, looped, or parallel HUMAN/WAIT cases have documented limits.
Oracle references: Prepare ATLAS tests · Evaluation scenarios
Chapter 4
Choose data and checks separately
File replay replaces eligible data-producing responses with saved fixtures. Routing, transformations, and model steps still run. You still need a compatible runtime and the models used by the workflow; replay is not an offline simulator.
Use recorded data for representative regression cases, generated data for deliberate edge cases, and live tests to check current services and access. Set masking rules before recording when sensitive values must not be retained.
Data source and evaluation are separate choices. Replayed data can still need semantic judging. Explore the combinations below to see what each one establishes.
Choose your evidence
What does this test establish?
Replay eligible saved responses and check the expected route and fixed output contracts. This does not evaluate flexible answer quality unless semantic judging is included.
All four combinations are illustrative. File replay still needs a compatible runtime; live recording and tests can execute business operations.
Oracle references: ATLAS overview · Assertions and semantic judging
Chapter 5
Read the evidence before the totals
First confirm the artifact, DRAFT or PUBLISHED version, inputs, data source, and run label. Then inspect routes, failed assertions, data readiness, and the answer-quality findings. Review cost and timing after correctness.
A needs-judge result means required answer evaluation is incomplete. Missing test data also leaves work unfinished. A plausible response or a green route does not replace the missing checks.
Individual reports explain one scenario. Suite reports summarize the selected tests. Attaching available judge results refreshes reports without rerunning the workflow. Repair a focused problem, then rerun the relevant suite with its normal checks.
Explore the parts
Green route, poor answer
Path checks pass, but the answer claims a laptop is available despite an empty fixture. The grounding criterion fails.
Investigate the response instructions or data handling. Keep the test expectation intact.
Oracle references: ATLAS test reports · Assertions and semantic judging
Chapter 6
Check the work behind the panel
An agentic application presents the workflow’s work to a person. Test its backing workflows first, including the app stages they actually handle: startup, a typed question, a summary, an action, or communication parameters.
Then check the top-level panels and their widget contracts. Does the intended workflow supply the response, and does that response meet the declared structure? Test empty or unmatched records rather than assuming the panel always has useful data.
An InitDisplay panel test does not establish every interactive browser behavior. Keep workflow, panel-contract, and visual review evidence distinct. Conversation tests belong with the workflows that support them.
Explore the parts
InitDisplay
Check the initial response and declared widget contract, backed by a tested workflow.
Sam opens the equipment panel and sees the expected fields from known records.
Oracle references: Application-facing tests
Chapter 7
Keep the tests useful after an edit
Suppose Sam changes the empty-inventory message. Inspect test impact, update tests for the intended change, and keep success and missing-input coverage. A test for a removed route should be reviewed rather than silently discarded.
When a test fails, locate the cause: the workflow, input, saved data, or an expectation that no longer matches an approved requirement. Do not rerecord data or weaken an assertion just to turn the result green.
Source-control the approved, self-contained tests with the artifacts. Keep generated reports as review or pipeline evidence rather than committing environment configuration and scratch output. Recheck coverage after changes made outside the assistant too.
A small challenge
A test fails after Sam’s change. What should happen first?
Choose an answer to explore the reasoning. You can try again.
Oracle references: CoE: Keep tests in sync
Chapter 8
Improve quality, then measure efficiency
Once the suite gives a reliable baseline, compare model choices on the same scenarios and fixtures. Keep baseline and candidate runs separate. A cheaper model is useful only when the required behavior and answer quality hold.
Node-level experiments can suggest model placements. Validate the combined plan before applying it: changes that work separately may interact. Review the evidence for the current workflow version, then retest the accepted edit.
AI-unit test budgets check individual runs. An economic profile combines representative scenarios, expected usage volume, and an approved allowance. Keep recorded and live baselines separate, label estimates, and review any proposed runtime allocation change.
Oracle references: CoE: Quality and cost experiments · CoE: Economic test guardrails
TAKE IT WITH YOU
You have a starting point.
Read further with Oracle
Concepts are summarized in plain language. Product availability and setup can vary by release and configuration.
- CoE: ATLAS learning path
- Oracle, chapter 16: ATLAS overview
- Oracle: prerequisites
- Oracle: work with ATLAS and prepare test data
- Oracle: assertions and semantic judging
- Oracle: run ATLAS tests
- Oracle: review reports
- Oracle: application-facing and conversation tests
- Oracle: final readiness checklist
- CoE: ATLAS alongside METRO
- CoE: coverage by node type
- CoE: test an Agentic App
- CoE: keep tests in sync
- CoE: improve cost and quality
- CoE: cost guardrails
When you are ready to build and test
Continue into the official learning paths when you want hands-on product setup.
Original learning stories & interactive examples © 2026 Sourabh Biharia.
Need a quick definition? Open the glossary