LEARNING / PRACTICAL COLLECTIONS
Package, review and import deliberately
A package is not the same as an active release. Record which revision was approved, what was produced and what reached the target. Keep target configuration changes visible rather than hiding them inside a success message.
Fictional learning examples, based on public 26D references. These exercises run in your browser and do not connect to Fusion. The configuration checkpoints are planning guidance, not a verified end-to-end Fusion lab.
The seven release gates are an authored engineering checklist. They are not an Oracle-mandated approval process or a production-readiness certification.
D05 / 26D REFERENCE
What you’ll take away
Produce a reviewable release decision, not a checked box.
8-12 min reading; project work varies · Time estimate, excluding access and setup.
Start with: Build evidence for behavior and cost.
A WORKED DECISION
The Starter Ready example
For the documented manual path, app export is JSON and workflow export is ZIP. Import is followed by target preparation and explicit publication; pipeline behavior must be verified separately.
Evidence to collect
- Approved revision
- Package inventory/checksum
- Target/import or pipeline result
- Dependency and configuration review
Is the intended version present, with all dependencies ready, before it is made available?
MAKE THE CALL
What would you do?
The pipeline reports success, but the owner has not confirmed the intended target version.
Choose an option to explore the result.
Read the recommended decision
Investigate before deciding. Inspect target artifact identity and state; pipeline status alone is insufficient.
RECOGNIZE THE CONTROLS
Inside AI Agent Studio
Actual UI controls from other example artifacts. These images do not show the fictional Starter Ready build running. Visible configuration is not execution evidence; labels and availability vary by release and permissions.
Find workflow lifecycle actions
Enlarge screenshot The workflow listing includes statuses and row actions. Availability varies by release and permissions; this image is not a completed export or import.
Look for: Check the selected workflow and publication state before opening its supported delivery actions.
FOLLOW THROUGH
Put the reasoning into practice
- Choose the supported manual import/export or configured delivery pipeline.
- Review source and tests before packaging. Store no secrets in the portable artifact.
- Record package identity/checksum and deployment/import reference.
- Complete tool-specific post-import setup: upload and republish Document Tool content, reconfigure Email tools and External REST authentication where used. Verify dependencies and target state before publishing for use.
Expected outcome
A named reviewer records pass, hold or a documented exception with scope and expiry. A demo success alone is not a release decision.
CHECK YOUR WORK
What needs to hold true?
Use this checklist for your own review. It is not an automated test result.
READ THE SOURCE
Official references
Product facts come from public Oracle sources. Sample rules, data, tests and experiments are original teaching examples.
- CI/CD Ch. 15 · Release 26D
- Migrate Apps or Workflows Ch. 13 · Release 26D