LEARNING / PRACTICAL COLLECTIONS
Put a real review boundary around a request
A second monitor needs Sam’s review. Build the decision boundary before thinking about automation. A request waiting for approval must stay pending; it must never look like a completed equipment order.
Fictional learning examples, based on public 26D references. These exercises run in your browser and do not connect to Fusion. The configuration checkpoints are planning guidance, not a verified end-to-end Fusion lab.
G05 / 26D REFERENCE
What you’ll take away
Model approved, rejected and unresolved outcomes, and keep approval separate from authorization to perform an action.
40-60 min · Time estimate, excluding access and setup.
Start with: Turn messy input into a dependable request, Compose one reusable stock check.
TRY THE IDEA
A small browser exercise
Explore the sample behavior before considering a sandbox build.
REQ-105 requests a second monitor. Explore the review states.
A fictional state explorer, not an executed approval process. Approval is not a downstream order or a grant of access.
THE CONTRACT
Worked example
Review request
{
"requestId": "REQ-105",
"item": "monitor",
"quantity": 2
}Pending
REQ-105 is awaiting review. No order has been placed.
Approved
Review approved. This lab records the decision only.
Rejected
Review rejected. No order has been placed.
RECOGNIZE THE CONTROLS
Inside AI Agent Studio
Actual UI controls from other example artifacts. These images do not show the fictional Starter Ready build running. Visible configuration is not execution evidence; labels and availability vary by release and permissions.
Inspect an approval process
Enlarge screenshot An approval process is open with notification and payload settings. No approval levels are configured in this view, and it does not show publication, Human Approval node binding or a completed review.
Look for: Find Add Level and payload setup. The documented flow requires configuring approvers, publishing the process and selecting it from the Human Approval node.
BUILD CHECKPOINTS
Plan the sandbox version
- Define the fictional rule: one monitor is standard; a second requires review.
- Keep the reusable stock-check child free of Human Approval and Wait in this example. Place the review step in the outer flow, following the cited CoE composition pattern.
- Publish the configured approval process, then select it through the Human Approval node’s Approval Process channel. Supply the minimum sample payload and identify the test reviewers.
- Represent pending, approved, rejected and unavailable/exception states in the lesson contract. Map only states actually supported by the target configuration.
- Stop at a review result. A later real order would need its own authorization, duplicate protection and implementation review.
Expected outcome
The demonstration preserves the difference between awaiting review, receiving approval and executing a downstream business action.
CHECK YOUR WORK
What needs to hold true?
Use this checklist for your own review. It is not an automated test result.
Sample policy, catalog and test inputs (JSON)
Before working in a sandbox
- Complete G01 and G03.
- An approved sandbox Approval Process channel, test reviewer and permission to configure it. No live procurement write.
The guide documents selecting a published approval process through the Approval Process channel. The workflow pauses while that process routes the request and resumes after the required outcome. Exact response fields, timeout, failure and feedback behavior require target validation. Approval stays outside the reusable child in this sample.
READ THE SOURCE
Official references
Product facts come from public Oracle sources. Sample rules, data, tests and experiments are original teaching examples.
- Human Approval channel Ch. 7 · Release 26D
- Composing AI solutions Oracle Fusion CoE · 2026-03-04
The article excludes embedded workflows with Human Approval or Wait. The sample keeps approval in the outer flow; verify the target release’s supported composition.
- Identity and security Oracle Fusion CoE · 2026-07-27